Play Chopper Ops Online Free

Enjoying Chopper Ops?

Loading...

Mode
Holds its height and levels out when you let go.
Game Utsav Chopper Ops
Rescue, firefight and strike by helicopter.
Loading the game...
Click the game first if keys don't respond. Esc pauses 3D games.

Take command of a utility helicopter with a real rotor model. Every sortie is a different job: land beside survivors and fly them to the hospital, scoop water from a lake and put out forest fires with the bucket, or hunt down enemy trucks, tanks and anti-air guns with your minigun and rockets. Land on the base helipad to refuel, repair and rearm. In Assisted mode the helicopter holds its height and levels itself; in Pilot mode you fly the collective and cyclic yourself.

How to play Chopper Ops

Chopper Ops is a 3D helicopter game with three kinds of mission. In a rescue you land next to survivors and carry them to the hospital pad. In a firefight you hover over a lake to fill your bucket and drop the water on forest fires. In a strike you hunt enemy trucks, tanks and anti-air guns with a minigun and rockets. Fuel, ammunition and armour are all limited, and the base helipad restores them.

  • W / S tilt forward and back, A / D slide left and right, Q / E turn
  • R / F climb and descend, Space minigun, X rockets, B water drop
  • C camera, P pause, I invert pitch
  • Touch: drag the left side to move, slider for climb, buttons for weapons

Tips for a higher score

  • Ease the stick, not the whole way: a gentle tilt gives smooth speed, and letting go brings the helicopter back to a hover.
  • Land gently on the pad or on flat ground; sinking faster than a few metres per second damages the helicopter.
  • For fires, fill the bucket low over the water, then drop it from under 60 metres so the water lands on the flames.
  • Anti-air guns hurt: strike them first from the side, and keep moving and low behind the hills.
  • When fuel or armour runs low, return to the base pad and land to refuel and rearm.

Chopper Ops FAQ

Is Chopper Ops free to play?

Yes. Chopper Ops is free on Game Utsav, with no download or install. It runs in your browser.

Does Chopper Ops work on a phone?

Yes. It works on phones, tablets and desktops, and many games also support a gamepad.

How do I save my score?

Create a free account to save your scores and appear on the leaderboards.

Comments